BUYER EDIT — About 巴嘎

BUYER EDIT — One building, two press lines, one kiln

A press line, a kiln, and a decision in 2009 not to subcontract either.

Large-format stone slabs stacked on edge in a warehouse
01
Position

Why we still own the kiln

Owning production is a commercial disadvantage in a good year. Everyone who subcontracts pressing can flex capacity up in a boom and pay nothing for it in a downturn, and for about three years that looked like the smarter model.

What it buys is colour. A fired surface is a recipe and a kiln curve, and both of them drift when the person running them changes every quarter. Our recipe has changed four times since 2009, each time deliberately and each time with the batch codes to prove when. That is not a claim a company can make about a product it buys finished from three suppliers.

The second thing it buys is a straight answer. When a fabricator calls about a slab that behaved unexpectedly, the person who can look up that firing is forty metres from the person who takes the call. It sounds like a small thing. It is most of the reason our long-standing customers are long-standing.

The roller kiln at the Castellón factory with slabs entering
The roller kiln. Every slab we have ever sold has been through this building.
02
History

Seventeen years, six decisions

Most of what a company does is not worth recording. These six changed how the material is made or where it goes.

2009

Founded in Vila-real

Four people and one second-hand press, making 900 × 900 panels for a local façade contractor. The first two years were entirely subcontract work under someone else’s name.

2013

First large-format press line

The move to 3200 × 1600 was a bet that architects would rather have fewer joints than a lower price per square metre. It took two years to look like the right call.

2016

First North American shipment

A single container to a fabricator in New Jersey who had seen the material at a trade show and ordered without a sample. He is still a customer.

2019

Second press line and the roller kiln

Capacity doubled and, more importantly, both lines started running the same recipe from the same silos — which is when batch-to-batch consistency stopped being a hope.

2022

Rotterdam warehouse

Ten-day delivery across northern Europe instead of six weeks from Spain. Lead time turned out to matter more to specifiers than anything we had done to the product.

2025

Newark warehouse

The same move for North America, and the reason the Vance Clinic project could be quoted against a fixed programme.

Finished slabs on A-frame racks in the warehouse
Inventory

Why we hold stock in three places

Holding slabs is expensive and it is the least fashionable thing a manufacturer can do. We do it because a specifier who has to wait six weeks for material will change the specification, and they are right to.

Between Vila-real, Rotterdam and Newark we hold roughly four months of the twelve stock finishes. It is why a ten-day quote is a ten-day delivery rather than an optimistic one.

03
The company

In numbers, honestly

Two of these are counts and two are capacities. We have marked which is which because a lot of companies in this industry do not.

240People
34Countries supplied
610Projects completed
1.4 M m²Annual capacity

Environmental statement — sample text supplied with this template. Recycled content, plant energy and end-of-life figures must be verified and replaced before publication.

Come and see it made.

Factory visits in Vila-real run most Tuesdays. Twenty minutes from Valencia airport, and you will see the kiln running.

mach1.aumdemo.com

Sintered stone and engineered quartz surfaces, pressed and fired in Castellón for architects and fabricators in Europe and North America.

Camí Vell 118, 12540 Vila-real, Castellón, Spain

+34 964 000 000 · hello@ardesasurfaces.example

© 2026 Ardesa Surfaces S.L. · Established 2009 · CE marked — sample statement, verify before publishing